Home AI Infrastructure NewsletterAI Scale-Up Networking: NVLink, Open Standards, and the Limits of Copper

AI Scale-Up Networking: NVLink, Open Standards, and the Limits of Copper

by Susana Schwartz
0 comments

AI Scale-Up Networking: NVLink, Open Standards, and the Limits of Copper

1200x627 8

For engineers, the way chips communicate inside a server rack directly dictates how fast they can train and run massive AI models, how much power their data center will burn, and whether they get locked into a single vendor’s hardware.

While open AI networking standards are advancing, proprietary hardware from Nvidia and Broadcom still dominate current data center deployments.

In our “Top Stories,” below, we take a closer look at scale-up networking inside the server rack and why it’s essential to preventing the bandwidth bottlenecks that can slow down AI models.

While open standards like UALink 2.0, UEC 1.1, and ESUN are maturing, it’s still Nvidia (NVLink) that dominates in terms of what companies actually buy and deploy.

Regardless of who wins the standards battle, everyone is running into the same physical wall. As we covered last week in AI TechTalk with Broadcom, the physical limits of copper are forcing a shift toward optics and the need for KV cache offload, as we discussed with Marvell not long ago.

Check out our top stories, and visit our RCR AI TechTalk page for past interviews with industry thought leaders and innovators, including companies like Equinix, Elea, Cerebras, Corning, Schneider Electric, and others.

Susana 2 150x150 21

Susana Schwartz 
Technology Editor
RCRTech

AI Infrastructure Top Stories

Scale-up networking: Domain size should be defined by a workload’s bandwidth and latency requirements. It must accommodate tensor and expert parallelism, and have enough pooled memory for the model’s weights and KV cache.

AI opps grow for Keysight: Leading chipset and NEMs have driven up revenues for Keysight Technologies, whose double-digit growth has been driven by early 6G development, non-terrestrial networks, and the expansion of AI infrastructure.

AI Today: What You Need to Know

Marlowe’s $277M seed round: Signaling a major financial bet that inference will be the next phase of AI growth, Marlowe raised $277 million at a $1.15 billion valuation to build infrastructure for running AI inference on non-Nvidia chips.

Megaspeed potential blacklisting: The U.S. Commerce Department’s Bureau of Industry and Security added Megaspeed International, along with 6 affiliates, to its Entity List over suspected diversion of advanced AI chips to China. 

Amazon acquisition of Decart: In order to optimize performance of its Trainium chips, Amazon will acquire AI optimization firm Decart for $7.5 billion, which could mean Trainium-based data centers for more customers (Anthropic as the first).

Cooling with non-potable water: Jet.AI and StratGrid unveiled a blueprint for an off-grid campus in Wheatland County, Alberta, which will pair a closed-loop liquid cooling system with dry coolers and air-cooled power island condensers.

Vantage Trident data center on hold: The Aurora City Council  announced the cancellation of plans for Vantage’s “Trident” data center campus off 48th Avenue – a primarily residential location. Vantage indicated it is reviewing alternative sites.

Latest RCRtv Interviews

Mark Bieberich, vice president of portfolio marketing at Ciena
 
Ravi Mahatme, Senior Director, Marvell Technology Photonic Fabric Group
 
Jeremy Deutsch, President of APAC at Vantage Data Centers

RCR Events

AI Infrastructure Forum, December 8th, Virtual
Join RCRTech’s AI Infrastructure Forum to explore how telcos, hyperscalers and data centres can compete or partner as AI shifts to inference, and who captures the value when every token counts. Register now

Wi-Fi Forum, January 19th, 2027, Virtual
Join the Wi-Fi Forum to hear from esteemed industry leaders, operators, enterprises, technology innovators, standards bodies, and policymakers on how Wi-Fi is evolving into intelligent infrastructure for the next generation of connectivity.  Register now

PTC’27, 17-20 January, 2027, Honolulu, Hawaiʻi
PTC’27 is the premier event for digital infrastructure, telecoms and ICT. Executives, investors and researchers meet to share knowledge, build relationships and drive new business. Register now

Industry Resources

You may also like

This website uses cookies to improve your experience. We'll assume you're ok with this, but you can opt-out if you wish. Accept Read More